This website uses cookies primarily for visitor analytics. Certain pages will ask you to fill in contact details to receive additional information. On these pages you have the option of having the site log your details for future visits. Indicating you want the site to remember your details will place a cookie on your device. To view our full cookie policy, please click here. You can also view it at any time by going to our Contact Us page.

Tesla charging stations to link Adelaide with world’s largest battery

30 September 2017

A network of car charging stations is being developed in South Australia to allow Tesla drivers to visit the world’s biggest lithium-ion battery being built by Elon Musk.

The new charging hub in Franklin Street, Adelaide (Credit: The Lead)

Eight fast charging stations: four generic chargers for a range of electric vehicles, and four Tesla Superchargers, opened in the capital city of Adelaide, completing an Australian Tesla charging network that stretches to Brisbane.

The fastest electric car charging units available in Australia, the Tesla Superchargers can charge Tesla Model S and X vehicles in 30 minutes, allowing a range of 168 miles.

Mitsubishi has also provided a fast charger at its own cost in the dedicated city charging area.

A Tesla charging station also opened at the Clare Country Club to complement two existing chargers in the wine region about 87 miles north of Adelaide. From there, it is only about 56 miles further to the site of the world’s largest battery being installed by Tesla at Neoen’s Hornsdale Wind Farm north of Jamestown.

Tesla CEO Elon Musk flew into Adelaide, the South Australian capital, in July to announce his company would build the 100MW/129MWh lithium-ion battery in the state’s Mid-North.

The tech billionaire told reporters the Tesla Powerpack would be three times as powerful as the next largest lithium ion battery.

“I was made aware there was this opportunity to make this significant statement about renewable energy to the world,” Musk said in July. “Coal does not have a long-term future.”

South Australian Energy Minister Tom Koutsantonis said construction at the site was well underway and the batteries were on track to be operational by December 1, the start of the Australian summer.

Last month, Fluid Solar took its four-storey, renewable energy powered headquarters about 17 miles north of Adelaide off the main electricity grid.

Surplus electricity generated at the site will be used as part of Tesla’s car-charging network, with 11 electric vehicle bays that will be supplied completely by solar power harvested from a 98kWp array of 378 PV solar panels on the building’s roof.

Eleven more electric vehicle charging points will be installed in the Adelaide Central Market car park in the centre of the city by the end of November and another 25 will be built around the city by mid next year.

South Australia leads the nation in the uptake of wind energy and roof-top solar with renewable sources accounting for almost 50 percent of the electricity generated in the state. However, the closure of two coal-fired power stations in recent years has increased South Australia’s reliance on energy supplies from the eastern Australian states, particularly in times of peak demand.

Source: The Lead


Print this page | E-mail this page