This website uses cookies primarily for visitor analytics. Certain pages will ask you to fill in contact details to receive additional information. On these pages you have the option of having the site log your details for future visits. Indicating you want the site to remember your details will place a cookie on your device. To view our full cookie policy, please click here. You can also view it at any time by going to our Contact Us page.

Designing for maintenance results in leak-free gearbox for London Underground

03 May 2019

Manufacturers are increasingly looking for ways to reduce the operating costs of their plant and equipment and cutting the cost of maintenance is currently very much in the spotlight as one way of achieving this.

It's quite common that when new equipment is specified, the first time the maintenance team see it is when it's installed, and yet the maintenance of it, throughout its life cycle, can be one of the plant’s most significant operating costs. That's changing though, and it's becoming more common for maintenance and design engineers to work together to make the reduction of maintenance a design priority.

Additionally, reducing maintenance isn't always just about cutting costs. Sometimes there are other factors that demand a significant reduction of maintenance. Like when maintenance engineers at the London Underground were forced to look at ways of reducing the maintenance on the networks’ escalator drive systems to comply with tight limitations on downtime.

On the London Underground there is just a four-hour window at night for general maintenance, and there are severe penalties if escalators are out of service beyond this permitted time frame. 

Read the full article in the May issue of DPA



Contact Details and Archive...

Print this page | E-mail this page

Hammond White Paper