This website uses cookies primarily for visitor analytics. Certain pages will ask you to fill in contact details to receive additional information. On these pages you have the option of having the site log your details for future visits. Indicating you want the site to remember your details will place a cookie on your device. To view our full cookie policy, please click here. You can also view it at any time by going to our Contact Us page.

The heart of Volkswagen’s ID.3: The battery system

06 December 2019

The Volkswagen ID.3 is fitted with a high-voltage battery system which looks similar to a bar of chocolate. But how does it work?

The components of the MEB battery system

Up to 341 miles with just one battery charge: Volkswagen’s fully electric ID.3 has impressive driving dynamics and great ranges. It is the first model of a product line of vehicles based on the modular electric drive matrix (MEB). Its fast charging capability allows the ID.3 to be recharged with 100kW charging power within 30 minutes for a range of around 180miles (WLTP). This is made possible by the heart of the electric vehicle: the battery. The ID.3 is fitted with a high-voltage battery system which looks similar to a bar of chocolate. Up to twelve battery modules are fitted and connected with each other inside the system. The Volkswagen Group Components plant in Brunswick will produce up to 500,000 of these energy storage devices per year in future. But how does such a battery system work?

The structure of a battery: cell - module - system

The high-voltage battery system uses lithium-ion cells, which are also used in mobile phones and notebooks. A single battery cell is the smallest unit in the battery system. It can store energy and release it again. 24 of these cells are currently consolidated into one battery module. The number of modules that are then put together to create a battery system is variable. This modular structure allows for maximum flexibility: if the customer requests a higher range, then more modules will be fitted to the battery system. The fundamental structure however remains the same. In the ID.3, up to twelve modules are put together via a battery connector to form a battery system. A voltage of up to 408 volts is applied in the system, which is considerably higher than that in a domestic socket, which only supplies 230 volts.

The power electronics control the high-voltage energy flow between the battery and the electric motor, converting the direct current (DC) stored in the battery to an alternating current (AC) for the traction motor. At the same time, the 12-volt direct current electrical system is supplied with low voltage using a DC/DC converter. In a normal alternating current system, the battery is charged with a maximum charging power of 11kW and in a direct current system with a charging power of up to 125kW.

Volkswagen ID.3

Central distribution point for energy

The MEB is making full use of the technical possibilities of electric mobility. The electric vehicle can be practically developed around the battery, so that there is enough space available for the energy storage device. This constructive approach offers numerous advantages for the positioning of drive components and ancillaries. The battery’s flat structure and design in the underbody also allows for a spacious vehicle interior between the axles. The aluminium battery housing with an integrated crash frame protects the battery and provides optimal stability as well as significant weight saving. The aerodynamics in the vehicle underbody are optimised by the solid collision protection components, also made out of aluminium, of the battery system.

New centre for battery expertise

The Volkswagen Group Components site in Brunswick, where battery systems for electric vehicles have been produced since 2013, saw the development of the entire MEB battery system, including the hardware and the software. On an area the size of nine football fields, a new factory with the most modern plant and production equipment was constructed. In future, up to 500,000 battery systems will be produced per year at the Volkswagen Group Components plant in Brunswick.


Print this page | E-mail this page

Igus - Tech Up, Costs Down