This website uses cookies primarily for visitor analytics. Certain pages will ask you to fill in contact details to receive additional information. On these pages you have the option of having the site log your details for future visits. Indicating you want the site to remember your details will place a cookie on your device. To view our full cookie policy, please click here. You can also view it at any time by going to our Contact Us page.

UK's IRR to participate in €18m EU Shift2Rail initiative

04 June 2015

The Institute of Railway Research (IRR) at Huddersfield is to investigate novel rail switches and crossings and look at possibilities for new kinds of track system.

Researchers at the University of Huddersfield's Institute of Railway Research will help develop radical new technologies such as 'self-correcting', maintenance-free tracks, as they take part in a major project designed to ensure that railways are fit for the future. 

The EU has given the go ahead to an ambitious, six-year initiative named Shift2Rail, co-financed by the private sector.  Its three main targets are to boost the capacity of Europe's railway network to cope with soaring demand; increase the reliability and quality of rail services; and make big reductions in costs. 

As a vital preliminary, the EU has announced three railway research programmes - dubbed 'lighthouse projects' – that will feed into Shift2Rail. These are: Roll2Rail, which will cover rolling stock; IT2Rail, which deals with information technology; and In2Rail, which investigates track and infrastructure and will be led by the UK’s Network Rail and Swedish railway administrator Trafikverket.

The University of Huddersfield’s Institute for Railway Research is one of 55 partners taking part in the €18 million In2Rail programme, and has been awarded key roles in two of its work packages - one that investigates novel switches and crossings and another that looks at possibilities for new kinds of track system. 

IRR’s Head of Research, Dr Yann Bezin

The IRR’s Head of Research, Dr Yann Bezin, said that the team would effectively be starting with a blank sheet of paper, as if railways were a completely new concept, without their long history. 

“We will trying to do something radically different and eliminate as much as possible the failure modes that are associated with the existing system,” said Dr Bezin.

For example, the IRR had been in talks with a number of partners over new rail principles that completely avoided switch rails as they are commonly used, which are exceptionally prone to damage.

IRR director, Professor Simon Iwnicki

Also under investigation will be the potential for smart tracks embedded with sensor technology and mechatronics that enable them to monitor for damage and self-adjust over time to compensate for normal wear and tear.  This would remove maintenance staff from the tracks, reduce disruption and fully enable 24-hour freight operation.

According to IRR director, Professor Simon Iwnicki, it is difficult, but achievable with smart systems and smart structures.  "And if you do have to suspend services, you only do it when it is absolutely necessary, plan it in advance and get in and out quickly,” he says. 

Among the research institutions working closely with the University of Huddersfield’s IRR on Shift2Rail is Loughborough University, which has special expertise in control systems. The IRR’s capacity for computer modelling will enable it to use simulation techniques in order to test the efficacy of some of the radically new systems being proposed.


Print this page | E-mail this page