This website uses cookies primarily for visitor analytics. Certain pages will ask you to fill in contact details to receive additional information. On these pages you have the option of having the site log your details for future visits. Indicating you want the site to remember your details will place a cookie on your device. To view our full cookie policy, please click here. You can also view it at any time by going to our Contact Us page.

Mitsubishi Electric HMIs backup/restore function enables fast PLC changeover

07 November 2012

When downtime can cost thousands of Pounds every hour, a faulty PLC can be a major problem. Replacing the faulty CPU is only half the story, the other half is restoring the correct program enabling the system to continue its operation unhindered.

This can mean the time and effort of bringing a PLC down onto the production floor, a frantic search for the original PLC program, and the requirement to initiate a connection between the two devices. The GOT1000 series of HMIs from Mitsubishi Electric, however, include the ability to back up the PLC program within the GOT terminal.

Now, if a connected PLC CPU should fail and need replacing, or if the program needs restoring for some unforeseen reason, the program can be restored directly from the HMI, saving valuable time and effort and ensuring production is restarted as quickly as possible.

The backup/restore function is simple to access from within the HMI as it utilizes either a CF card or USB stick. The network connection between the HMI and the PLC makes restoring a program quick and easy after a CPU changeover. The GOT1000 series HMIs can thus play a key role in managing product changeovers and maintenance recovery plans, ensuring production efficiency is maintained at all times.


Contact Details and Archive...

Print this page | E-mail this page

Minitec